Images for an architecture competition
A competition has a fixed date and a jury that spends a few minutes on each entry. The images are not there to be admired, they are there to make the idea readable before anyone reads the text.
Three views do more than six
Most entries would be stronger with fewer images. One view that states the idea, one that shows the project in its site, one interior or detail that proves the quality of use. Beyond that, each additional image divides the attention rather than adding to it.
The exception is a programme where circulation is the subject. There, a short animated sequence does what no still can, and a thirty-second walkthrough from EUR 3,500 replaces three static views that would each miss the point.
Working backwards from the deadline
Count four to six working days per exterior view and eight to ten for a set of five interiors, then add your own time for comments. A competition handed over on a Friday for a Monday deadline is not a schedule, it is a gamble on nothing going wrong.
The usable method is to send the model as soon as the massing is frozen, even if materials are still open. Framing and light can be set on a grey model, and the material pass comes in at the end. That is how a late design change stays affordable.
Confidentiality until the result
Competition work is published only after the result, and only with your written agreement. An NDA is signed on request, before any file is exchanged. Your files serve your images. Nothing else.
If the entry wins, the same model usually serves the communication that follows, which costs far less than rebuilding it for the press release.
Frequently asked
Can you hold a fixed competition date?
Yes, if the schedule is agreed before we start and the model arrives when planned. We say no rather than accept a date we cannot hold.
Do you work on grey models?
Yes. Framing and lighting can be settled on an untextured model, which lets the material decisions stay open longer.
Read next
How much does an architectural rendering cost?Renderings for a planning applicationHow long does an architectural rendering take?